Pre-engineered Steel Structure
Creates a synchronized foundation for schedule, coordination and execution.
FrameX integrates pre-engineered steel, high-performance insulation and comprehensive waterproofing from the start so every detail connects more coherently.
When structure, envelope and waterproofing follow separate, disconnected workflows, risk doesn't sit in the obvious places — it sits at the intersections that are easily overlooked. That's when schedules stretch, concept gets broken, extras become opaque, and operational failures appear after handover.
Multiple contacts
Multiple interpretations
Compounding risks at handover