Comparative
QAQC / ITP / Water-test — Quality Controlled by System
FrameX controls quality through QAQC, ITP, and water testing to ensure the project meets acceptance standards.
5 min read

At FrameX, project quality is controlled through a clear system rather than intuition. From incoming materials and factory fabrication to site erection, envelope works, and waterproofing, every scope is monitored through QAQC and ITP checkpoints.
For waterproofing-related works, water testing is a critical acceptance step to confirm the system performs correctly before handover. This approach reduces disputes, improves traceability, and ensures the handover package contains proper quality evidence.